Baier Laminate Flooring Installation Guide

Introduction

Baier laminate flooring is designed for simple and efficient installation using a click-lock floating system.
This guide provides step-by-step instructions to help installers achieve the best results — ensuring your floor stays durable, level, and visually seamless for years to come.

Learn more about proper laminate flooring installation from the[North American Laminate Flooring Association] guidelines.

Suitable for:
Residential homes, offices, commercial spaces, and renovation projects.

Step-by-Step Installation Instructions

STEP 1: Prepare your subfloor

Preparing Subfloor for Laminate Flooring Installation

First of All:Let all flooring materials sit in the room for 48 hours before installation—this helps avoid expansion or buckling after it’s laid.

🔧 What to Do:
Sweep the floor thoroughly. Remove all dust, nails, adhesive residue, or staples.
Check for flatness using a 2-meter straightedge—no deviation should exceed 3mm.
Use leveling compound to fix dips or grind down high spots.
For concrete, perform a 24-hour moisture test using plastic sheeting.
For wooden subfloors, locate squeaks and re-secure loose boards with screws.


⚠️ Important Tips:
Uneven surfaces will cause clicks, hollow sounds, or open joints.
A dry surface doesn’t mean a dry substrate—moisture testing is mandatory.
Never skip this step. A perfect install starts with a perfect base.

STEP 2: Choose your underlay

laminate flooring underlay choice

🔧 What to Do:
Select underlay based on the subfloor and project needs (foam, IXPE, rubber, cork).
For concrete, always use an underlay with an integrated vapor barrier.
For multi-story buildings, use acoustic underlay to reduce footfall noise.
Keep underlay thickness between 1.5–3mm to maintain proper locking performance.

⚠️ Important Tips:
Never install laminate directly over concrete without moisture protection.
Too thick of an underlay can compromise the locking system.
Ask your supplier to match underlay specs to the flooring’s click-lock design.

STEP 3: Install Your Underlay

underlayment for laminate flooring

🔧 What to Do:
Start from one corner of the room. Unroll the underlay perpendicular to the plank direction.
Lay strips edge to edge—do not overlap.
Tape the seams using aluminum foil tape or the attached self-adhesive strip.
Trim excess underlay along the wall using a sharp utility knife.
Walk over the entire area to check for bubbles, wrinkles, or soft spots. Fix as needed.

⚠️ Important Tips:
Overlapping or wrinkled underlay will lead to floor movement and uneven joints.
If your underlay has a foil barrier, it must face up—otherwise, moisture protection fails.
Do not run underlay up the wall. Keep it flat and flush to the edge only.

STEP 4: Start laying your laminate floor

installation start of laminate

🔧What to Do:
Calculate layout first: Divide the room width by plank width to see how many full rows you’ll need.
If the last row is too narrow (<5 cm), trim the first row to balance the layout.
Mark the endpoint for the last full plank on the wall to guide alignment.
Unpack and mix planks from multiple boxes to spread color and pattern variation.
Start from the longest wall, but leave space between the floor and the wall—walls are rarely perfectly straight.
Lay the first row with the tongue side facing the wall, using spacers to maintain an 8–12 mm expansion gap.
Begin the second row by clicking the first plank into the long side of the first row at an angle, then lower and lock.
Stagger all end joints—keep at least 30 cm offset between plank ends from row to row.

⚠️Important Notes:
A crooked first row will affect the entire floor—double-check alignment before continuing.
Never align end joints in consecutive rows; this weakens the structure and looks unnatural.
Do not glue laminate planks—Baier’s click-lock system is designed for floating installation.
Don’t skip the expansion gap. Laminate needs room to move with temperature and humidity changes.

EXTRA STEP: Saw Your Laminate Floor

cutting laminate flooring

🔧What to Do:
Cutting is unavoidable to fit your laminate floor perfectly in any room shape. Always wear protective gloves and use a pencil to mark your cutting lines clearly. When sawing, place the plank with the decorative top surface facing upwards to prevent chipping or damage.

Use a fine-toothed saw, such as a jigsaw or circular saw with an appropriate blade, to ensure clean, straight cuts. Measure twice, cut once!

⚠️Important Notes:
Cutting with the decorative side down may cause splintering or rough edges.
Keep your workspace clean and secure the plank firmly before cutting to avoid slipping.
Always wear eye protection and follow tool safety guidelines.

STEP 5: Finish your laminate floor in style

skirting board for laminate

🔧What to Do:
Once all laminate planks are installed, complete your floor by adding matching skirting boards and finishing profiles. These cover the expansion gaps around the room and give your floor a polished, professional look.
Use finishing profiles for transitions between different flooring types or to cover door thresholds. Ensure all moldings are fixed to the wall, not the floor, so the floor can expand and contract naturally.

⚠️Important Notes:
Skipping skirting or profiles can leave gaps visible and reduce floor stability.
Never nail or glue moldings directly to the laminate floor.
Choose profiles that match or complement your laminate’s color and style for a seamless finish.

Tool List: All the tools you need

how to lay laminate flooring tool list

🔧 Essential Tools:
Tape Measure: For accurate room and plank measurements.
Pencil & Straightedge: To mark cutting lines precisely.
Spacers: To maintain consistent expansion gaps around walls and obstacles.
Tapping Block & Pull Bar: To lock planks tightly without damaging edges.
Jigsaw or Circular Saw: For cutting planks to fit corners and edges.
Rubber Mallet: To gently tap planks into place.
Utility Knife: For trimming underlay and minor adjustments.
Protective Gloves & Safety Glasses: For personal safety during cutting and installation.
Vacuum or Broom: To keep the work area clean from dust and debris.

⚠️ Important Notes:
Using the right tools ensures a smoother installation and protects your flooring from damage. Avoid makeshift tools or excessive force which can damage the locking mechanism or plank surfaces.

Installation Tips

Recommended Tools

  • Tape Measure: For accurate room and plank measurements

  • Pencil & Straightedge: To mark cutting lines precisely

  • Spacers: Maintain expansion gaps

  • Tapping Block & Pull Bar: Lock planks without damage

  • Jigsaw or Circular Saw: For cutting planks

  • Rubber Mallet: Gentle tapping

  • Utility Knife: Trim underlay and minor adjustments

  • Protective Gloves & Safety Glasses: Safety during cutting

  • Vacuum or Broom: Keep area clean

Common Mistakes to Avoid

  • Expansion gaps: Failing to leave expansion gaps

  • Subfloor issues: Installing over uneven or wet subfloors

  • Adhesive misuse: Using adhesive on click-lock planks

  • Acclimation: Ignoring acclimation time

  • Alignment: Crooked first row or aligned end joints

  • Gaps: Skipping expansion gaps

Installation & Maintenance Advic

  • Acclimation: Acclimate flooring 48 hours before installation

  • Underlay: Lay underlay correctly (no overlaps, foil barrier facing up)

  • Stagger joints: Stagger plank end joints at least 30 cm apart

  • Cutting: Cut planks decorative side up to prevent chipping

  • Skirting & profiles: Install on walls, not on flooring

  • Cleaning: Clean with a damp mop (not wet)

  • Moisture: Avoid standing water

  • Furniture protection: Use felt pads under furniture legs

  • Wax/polish: Do not use wax or polish products

Frequently Asked Questions

Can I install laminate flooring over concrete?

Yes, but ensure the concrete is clean, dry, level, and use an underlay with a vapor barrier.

How long should the flooring acclimate before installation?

All flooring materials should sit in the installation room for at least 48 hours before laying.

Do I need special tools for installation?

Basic tools like spacers, tapping block, pull bar, saw, mallet, and protective equipment are sufficient.

Need Technical Support?

Our installation specialists are ready to assist with subfloor preparation, tool selection, or maintenance advice.

Contact Baier Technical Team

Back to All Installation Guides